by Biltmore | Feb 26, 2016
Biltmore Construction performed extensive interior and exterior renovations and upgrades to this US AmeriBank Branch. The existing bank interior was completely demolished and renovated. Renovations included replacing the electrical, mechanical and plumbing...
by Biltmore | Feb 26, 2016
Keys Energy Services / Transmission and Distribution Administration Building / New, two-story 8,695 GSF New two-story 8,695 square feet concrete office building with storage and parking at ground level, and the selective demolition and renovation of adjacent existing...
by Biltmore | Feb 26, 2016
The Elliot Museum / New multi-story steel and architectural precast museum / 48,600 GSF The new multi-story museum houses exhibit space for art collections, interactive displays, tiered-seating theater and lecture hall, open display gallery, archival library,...
by Biltmore | Feb 26, 2016
Zota Beach Resort / New six-story beachfront resort / 132,000 GSF New construction of a six-story hotel and lobby connecting to existing five-story tower including all amenities: pool, restaurant, banquet and meeting rooms, administration/staff offices and luxury spa....
by Biltmore | Feb 26, 2016
Station Square / New 15-story multipurpose cast-in-place condominium / 520,000 GSF This new 15-story structure anchors the City of Clearwater’s downtown redevelopment district. The ground floor houses 10,000 GSF of retail space, with a five-level parking garage shared...